Oops! 3.3 ton device stuck inside Japanese reactor

Don’t know how I missed this story. The Mainichi Daily News reported last week:

Agency gears up to retrieve device fallen inside Monju reactor

TSURUGA (Kyodo) — The Japan Atomic Energy Agency began preparatory engineering work Tuesday to set up equipment it will use to retrieve a device that fell inside the vessel of its prototype fast-breeder reactor Monju in Fukui Prefecture last August, agency officials said.

The agency aims to collect the cylindrical 3.3-ton device together with part of the vessel’s upper lid by mid-June to get the reactor back to normal by autumn, allowing the resumption of a test run of the 280,000-kilowatt prototype, the officials said.

But it is unknown when the test run will begin at the unit on the Sea of Japan coast as Prime Minister Naoto Kan has declared a review of Japan’s basic energy plan following the nuclear accident at the Fukushima Daiichi power plant caused by the March 11 earthquake and tsunami.

After the Aug. 26 accident, the agency tried in October to recover the device used in fuel exchange but failed as it had become misshapen, preventing its retrieval through the upper lid.

Here’s a link:

 

Advertisements

About Robert Singleton

By day, I work for a call center. In my spare time, I try to save my hometown (and planet) from a nearly constant onslaught of greedheads, lunatics and land developers. I live in a fictional town called Austin, Texas, where I go to way too many meetings.
This entry was posted in Japan, Reactor problems and tagged , , . Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s